Food Processing Organization Reduced Changeover Time By 53% With Kure


Project Summary

  • The problem: A food processing organization was experiencing lengthy production changeovers that created unnecessary downtime, increased labor costs, and reduced equipment utilization during egg collection operations.

  • After applying Kure's structured improvement methodology, the organization reduced average changeover time from 15 minutes to 7 minutes, a 53% improvement that reduced downtime, improved production flow, and increased operational efficiency.


Introduction

In food processing, every minute of production matters. Delays during product changeovers can reduce productivity, increase operating costs, and make it more difficult to meet customer demand. This food processing organization recognized that its changeover process represented a significant opportunity for improvement and wanted a practical, sustainable solution that could be implemented consistently across its operation.

Using Kure, the team followed a structured improvement process to identify root causes, evaluate opportunities, prioritize solutions, and implement standardized improvements. Throughout the project, the team embraced the principles of Ethical Efficiency, focusing on reducing wasted time and improving the employee experience without increasing workloads or requiring additional staffing. The result was a process that delivered better outcomes for both employees and the business.

The Problem

Product changeovers had become the largest source of downtime within the egg collection operation. Every time production switched between different stock keeping units (SKUs), employees spent more time than necessary preparing equipment, updating date coding information, and managing production during the transition.

These delays reduced equipment utilization, increased labor costs, and interrupted production flow. Without a standardized process, changeover performance varied between shifts, making it difficult to maintain predictable production schedules. Improving this process was essential for increasing productivity while maintaining the consistent quality expected in food processing.

The Root Causes

Using Kure's guided improvement framework, the team identified several contributors to the lengthy changeovers.

Date coding information was often entered during the changeover instead of before production began, creating unnecessary downtime. Employees also lacked a consistent method for preparing the next production run, causing collection tables to become overloaded as one product ended and another began.

In addition, responsibilities during changeovers were not clearly defined, and no documented standard process existed. Employees relied on individual experience rather than a repeatable method, resulting in inconsistent execution across shifts.

The Solutions

The team implemented several practical improvements identified through Kure.

Date coding information was prepared before production and incorporated into the post-operation checklist so equipment would be ready before the next day's production began.

Hand-pack operators began preparing the next SKU before the current production run ended, reducing delays and preventing collection tables from becoming overloaded during product transitions. Employees responsible for the collection tables were assigned clear ownership for monitoring tray counts as production neared completion, supported by standardized procedures and training.

Finally, the production manager documented the complete changeover process and established standardized work instructions that supervisors implemented consistently across every shift.

The Results

The project produced measurable improvements throughout the egg collection operation.

Average changeover time decreased from 15 minutes to just 7 minutes, representing a 53% reduction in downtime.

The standardized process improved equipment utilization, reduced labor costs, and created a smoother production flow between product runs. Employees understood their responsibilities more clearly, transitions became more predictable, and the organization improved its ability to meet production schedules while maintaining product quality and customer satisfaction.

Conclusion

This project demonstrates how a structured improvement approach can transform everyday operational challenges into measurable business results. By using Kure to guide the improvement process, the organization successfully standardized one of its most important production activities while reducing its largest source of downtime by more than half.

Kure's AI-guided improvement platform helped the team identify root causes, organize ideas, implement practical solutions, and sustain improvements more efficiently than traditional improvement efforts. By applying the principles of Ethical Efficiency, the organization improved performance through smarter processes rather than additional resources, creating a more consistent, productive, and employee-friendly operation. The success of this project provides a strong foundation for future continuous improvement initiatives and positions the organization for continued operational excellence.

*We value our clients’ confidentiality. While we’ve changed their names, the results are real.


Supercharge your Lean Six Sigma projects and create Ethical Efficiency™ with Kure.

Bill Eureka | VP of Product at Kure

Bill Eureka has over 40 years of continuous improvement experience in a wide range of businesses including manufacturing, servicing, healthcare, sales and executive leadership. He has helped over 400 organizations improve quality and profitability by leveraging the right improvement methodologies to help them achieve their business goals. Bill is a Professor in the School of Business at Davenport University.

Previous
Previous

Canadian University Reduced Ticket Completion Time By 33% With Kure

Next
Next

Oil & Gas Organization Reduced Permit Errors By 92% With Kure