Ethical Efficiency™ in action
Case Studies
Medical Materials Manufacturer Reduced Changeover Time By 66% With Kure
Project Result: Reduced changeover time from 133 minutes to 45 minutes—a 66% improvement.
Food Manufacturer Reduced Package Weight Variation By 44% And Unlocked $757K In Annual Savings With Kure
Project Result: Reduced package weight variation from 36 grams to 20 grams—a 44% improvement.
Manufacturer Increased Box on Demand Throughput By 38% With Kure
Project Result: Increased throughput from 67 boxes per hour to an average of 92.8 boxes per hour—a 38% improvement.
Manufacturer Improved On-Time Completion By 157% With Kure
Project Result: Improved on-time completion rate from 35% to 90%—a 157% improvement.
Industrial Machinery Manufacturer Increased Service Warranty Claims Filing Rate By 44% With Kure
Project Result: Increased warranty claim filing rate from 43% to 62%—a 44% improvement.
Manufacturer Increased Epoxy Production Output By 45% With Kure
Project Result: Increased production output from 44 parts to 64 parts per hour on average—a 45% improvement.
Lab Equipment Manufacturer Decreased Return Material Authorization Turnaround Time By 55% With Kure
Project Result: Reduced the Return Material Authorization turnaround time from 33 to 15 days—a 55% improvement!
Automobile Manufacturer Reduces Robotic Welder Parameter Development Time By 76% With Kure
Project Result: Reduced approval times from 6.4 weeks to just 1.5 weeks—a 76% improvement!
Manufacturer Decreased Preventive Maintenance Start Time By 50% With Kure
Project Result: Reduced the time spent gathering supplies by 50% and improved preventive maintenance processes.
Automotive Manufacturer Reduces Parts Damage By 92% And Saves $780K Per Year With Kure
Project Result: Reduced damaged parts from 12 per day to just 1 per day—a 92% improvement!
Manufacturer Reduced Dirty Parts Returns By 100% With Kure
Project Result: Reduced incidents of dirty parts being returned by customers from 8 to zero—a 100% improvement!
Manufacturer Increased Production By 30% With Kure
Project Result: Increased production from 415 to 537 units per shift—a 30% improvement!