Case Studies
Manufacturer Improved Tool Room Efficiency By 24% With Kure
Project Result: Reduced average maintenance hours from 66.6 to 50.8—a 24% improvement.
Energy Manufacturer Reduced Internal Audit Cycle Time By 52% With Kure
Project Result: Reduced average audit cycle time from 5 days to 2.4 days—a 52% improvement.
Energy Manufacturer Reduced Banding Operation Cycle Time by 39% With Kure
Project Result: Reduced average banding cycle time from 188 seconds to 115 seconds—a 39% improvement.
Manufacturer Reduced Yoke Fabrication Setup Time By 68% With Kure
Project Result: Reduced average yoke fabrication setup time from 17.6 hours to 5.6 hours—a 68% improvement.
Medical Supply Manufacturer Reduced Tube Assembly Cycle Time By 25% With Kure
Project Result: Reduced manual assembly cycle time from 8.4 seconds to 6.3 seconds—a 25% reduction.
Tape Manufacturer Reduced Tape Breaks By 30% With Kure
Project Result: Reduced tape breaks from an average of 173 to 122 instances per million pounds produced, a 30% improvement in process performance.
Food Manufacturer Reduced Raw Material Release Time By 39% With Kure
Project Result: Reduced average raw material release time from 23 minutes to 14 minutes, improving the process by approximately 39% while creating a more organized and consistent workflow.
Manufacturer Decreased Cable Assembly Defects By 80% With Kure
Project Result: Reduced average open circuit defects from 6.5 defects per week to 1.3 defects per week, achieving an 80% improvement.
Glass Manufacturer Improved Order Fulfillment Accuracy By 78% With Kure
Project Result: Reduced monthly picking errors from 9 to 2, resulting in a 78% increase in order fulfillment accuracy.
Medical Materials Manufacturer Reduced Changeover Time By 66% With Kure
Project Result: Reduced changeover time from 133 minutes to 45 minutes—a 66% improvement.
Food Manufacturer Reduced Package Weight Variation By 44% And Unlocked $757K In Annual Savings With Kure
Project Result: Reduced package weight variation from 36 grams to 20 grams—a 44% improvement.
Manufacturer Increased Box on Demand Throughput By 38% With Kure
Project Result: Increased throughput from 67 boxes per hour to an average of 92.8 boxes per hour—a 38% improvement.